Engineering Department

Contact:
Dan Olson
403-207-7045

The Engineering Department of the Town of Chestermere is responsible for review and approval of all engineering drawings for new subdivision, capital projects and other infrastructures including but not limited to roads, surface drains, sidewalks, curbs & gutters, asphalt, stormwater and shallow utilities (electric, gas, cable and telephone). EPCOR water services, on behalf of the Town, is responsible for water and sanitary infrastructure operations, maintenance, capital work design/construction, and reviews/approvals/inspections of water and sanitary sewers of new subdivision. While EPCOR is responsible for all engineering reviews and approvals of the water and sanitary infrastructures based on the set engineering standards and specifications, the Engineering Department is responsible for Municipal approvals of the water and sanitary infrastructures.

Subdivisions are reviewed for conformance to the City of Calgary’s standards and guidelines; however, the department is in the process of setting the Town of Chestermere’s specific engineering standards.

Utilities Master Plan 2008 Published in 2010

The engineering standards prepared so far are:



Please communicate with EPCOR water services at 403-207-4503 for any clarification on water and sanitary related posted materials.

The following documents are available for stakeholder use:
East and West Chestermere Drive Proposal

East Chestermere Drive Improvements:E1, E2, E3, E4, E5, E6
West Chestermere Drive Improvements: W1, W2, W3, W4, W5, W6

Highway 1 and Highway 1A Interchange – for more information please contact Alberta Transportation:

In Alberta toll free 310-0000,(from a cell phone #310 on Telus, or *310 on AT&T),
then 780-427-2731
Outside of Alberta 780-427-2731
Monday-Friday 8:15 am – 4:30 pm.

Engineering Department Contact Information:

Telephone: (403) 207- 7074
E-mail: